To determine the correlative forced ramming parameter and get the correct appraisement by setting the forced ramming test area in Chongqing, the problem resulted from the insufficient design and construction experience of the forced ramming technology adopting in Chongqing will be resolved in an effective way and get better economic benefit.
在重庆地区,通过建立强夯试验区来确定相关夯击参数,并且给予正确的评价,能有效地解决在重庆地区采取强夯工艺进行设计、施工经验不足的问题,并能取得较好的经济效益。