The turbine base frame operating layer of a 600 MW coal-fired unit is a complicated reinforced concrete structure,marked by dense steel bars and strictly required construction accuracy of various embedded parts,directly-buried bolts and embedded pipes.
600MW燃煤机组汽轮机基座运转层是一个复杂的钢筋混凝土结构,钢筋密集,各专业预埋件、直埋螺栓、预埋管的施工精确度要求非常高。
本站部份资料来自网络或由网友提供,如有问题请速与我们联系,我们将立即处理!
版权所有©四级英语单词 网站地图 陇ICP备2023000160号-4
免责声明:本站非营利性站点,以方便网友为主,仅供学习。